St Swim Link Wiring Diagram. Important use of non copper wire using non copper wire can be dangerous and also can be the cause of a spas malfunction. General information the function manuals contain detailed descriptions on general topics regarding the simatic et 200sp distributed io system eg.
Connect the heating control circuit to the heat link 1. B stm8 swim target connector 3. Remove the heat link cover and connect the l live and n neutral terminals on the heat link to the l and n circuit on the boiler or junction box.
3 v to 36 v application voltage support on the uart interface and 5 v tolerant.
The wiring diagram inside the system box shows the main terminal block as tb1. A stm32 jtag and swd target connector 2. Swim activation timing diagram the swim activation is shown in figure 4 and each segment of the diagram is described below. An stm8 connector for the swim interface.